Temporary Works — Facade Retention projects.
Built in 3 phases this project required the retention of 4 building facades typically 18m high and of lengths between 8m and 80m.
Read MoreRetention of building facades up to 22m high on 4 elevations, total 140m long, basement propping to vault perimeter walls and new basement within king post wall up to 10m deep, tower crane bases.
Read MoreThis large scale redevelopment comprised the demolition of a hotel which in itself comprised a series of old houses with openings formed between, retaining building facades totalling 200m length up to 20m high in a conservation area and construction of a new 170m x 35m x10m deep basement.
Read More